    risk register template

    Dedicated risk register with likelihood × impact scoring, owner accountability and mitigation tracking.

    Use the free RAID log generator, add items live and export to PDF or CSV.

    Build it online free

    A risk register is a focused subset of a RAID log, it tracks only risks (and crystallised issues), scored consistently, owned individually, and reviewed on a rhythm. If your organization requires a separate risk register for audit or regulatory reasons, this template gives you a defensible structure.

    Risks are scored on likelihood (1–5) and impact (1–5). The product gives a heat-map position. Anything scoring 15+ (high × high or higher) is automatically a steering committee escalation. Every risk carries a named owner, a mitigation plan, a contingency plan, and a review date.

    In Pocket PMO, risks scored 15+ are automatically pulled into the weekly status report and the AI Project Team flags any risk without a review in the last 14 days.

    What's inside

    • •Likelihood × impact scoring matrix (1–5 each)
    • •Heat-map colour banding (1–6 green, 8–12 amber, 15+ red)
    • •Owner, mitigation, contingency, target close date
    • •Review history column
    • •Categorisation (delivery, financial, reputational, regulatory, technical)

    When to use it

    • •Regulated industries requiring a standalone risk register
    • •Programme-level risk consolidation across projects
    • •Audit and assurance reviews

    Template structure

    Every section below appears in the downloadable PDF as a ready-to-fill table.

    Risk

    IDCategoryDescriptionTrigger eventOwner

    Scoring

    Likelihood (1–5)Impact (1–5)Score (L×I)Heat-map bandTolerance breach (Y/N)

    Response

    Strategy (avoid/reduce/transfer/accept)Mitigation planContingency planCost of mitigation

    Tracking

    StatusLast reviewedNext reviewTarget close dateActual close date

    Use it live in Pocket PMO

    The PDF is fine. The live version is better: auto-fill from your project, full audit trail on every change, AI Project Team drafts the tricky sections, and steering committees see one canonical version, not a stale spreadsheet copy.

    Want this embedded in your team?

    A quoted 4-week service with a senior delivery consultant: live projects brought up to date, PMs trained, and reporting and governance switched on.

    See the 4-week embedding